Drinking water and sanitation · Water Distribution Authority (REGIDESO)
No drinking water in Kavimvira after pipes cut by heavy rains
Since the torrential rains destroyed the bypass road and the old railway bridge, and also cut the REGIDESO pipes serving the commune of Kavimvira, the population lacks drinking water and gets its supply from the lake and the ponds. This is a public health risk: the lake water is not fit for consumption, and households are unable to buy 20 litres of drinking water at 7,000 FC or 1.5 L at 1,500 FC.
Being handled Urgent
- Received09/11/2026
- Taken in charge10/11/2026
- ResolvedWaiting
- 4days since the request
- 38 hto be taken in charge
- —to be resolved
- —resident’s satisfaction
What the resident reported
Since the torrential rains destroyed the bypass road and the old railway bridge, and also cut the REGIDESO pipes serving the commune of Kavimvira, the population lacks drinking water and gets its supply from the lake and the ponds. This is a public health risk: the lake water is not fit for consumption, and households are unable to buy 20 litres of drinking water at 7,000 FC or 1.5 L at 1,500 FC.
Translated by the AI assistant.
Original text
Depuis les pluies torrentielles ayant détruit la route de déviation et l'ancien pont de la voie ferrée, coupant aussi les tuyaux de la REGIDESO qui desservaient la commune de Kavimvira, la population manque d'eau potable et s'approvisionne dans le lac et les étangs. Il s'agit d'un risque de santé publique : l'eau du lac n'est pas propre à la consommation et les ménages sont incapables d'acheter 20 litres d'eau potable à 7 000 FC ou 1,5 L à 1 500 FC.
What the City did
-
10/11/2026 19:28 · Being handled
-
09/11/2026 05:47 · Received
Demande reçue.
Other requests in Kavimvira Municipality
- Taken in charge10/11/2026 · Kavimvira Municipality Potholes on the RN30 and road works too slow Many potholes on the RN30. The company EIS AFRICA is too slow to finish building the road. Roads, bridges and streets — Kavimvira
- Taken in charge06/11/2026 · Kavimvira Municipality Too many petrol stations in Kavimvira Since the start of the year, more than 30 stations have been counted in a small area of only 10 km². Fuel and hydrocarbons (stations, depots, prices) — RN30
- Being handled05/11/2026 · Kavimvira Municipality Street lighting out on National Road 30 in Kavimvira Out of order for years along the whole road in Kavimvira commune, which causes insecurity at night. Street lighting — Toute la route nationale 30
- Being handled17/10/2026 · Kavimvira Municipality Road cut between Kavimvira and Mulongwe after heavy rain On 17 October 2026, rain flooded the detour under the new bridge and tilted the old bridge's abutment. Only pedestrians can cross. Roads, bridges and streets — RN5, déviation sous le nouveau pont de la rivière Kavimvira