Collapse of the Kavimvira bypass bridge
The Kavimvira bypass bridge, inaugurated in 2016, collapsed under a truck carrying sheet metal that was apparently overloaded. Hundreds of pedestrians, motorbikes, bajaj, buses and taxis were left stranded on both sides of the river. According to local residents, the bridge had been deteriorating for months.
Resolved Urgent
- Received16/06/2026
- Taken in charge17/09/2026
- Resolved10/11/2026
- 150days since the request
- 2235 hto be taken in charge
- 147.5 jto be resolved
- —resident’s satisfaction
What was reported
The Kavimvira bypass bridge, inaugurated in 2016, collapsed under a truck carrying sheet metal that was apparently overloaded. Hundreds of pedestrians, motorbikes, bajaj, buses and taxis were left stranded on both sides of the river. According to local residents, the bridge had been deteriorating for months.
Translated by the AI assistant.
Original text
Le pont de déviation de Kavimvira, inauguré en 2016, s’est effondré sous un camion de tôles apparemment en surcharge. Des centaines de piétons, motos, bajaj, bus et taxis sont restés bloqués des deux côtés de la rivière. Selon les riverains, le pont se dégradait depuis des mois.
Reported by Dalili B. John
What the City did
-
10/11/2026 19:31 · Resolved
Le pont construit pas EIS-EKA a été ouvert à la circulation 48 heures après.
-
17/09/2026 10:00 · Being handled
Un nouveau pont est en construction à côté par l’entreprise EIS-EKA (conçu pour 35 tonnes). Un mouvement citoyen a demandé le 14 septembre 2026 où sont passés les éléments métalliques démontés ; aucune réponse publiée.
-
16/06/2026 07:00 · Received
Problème signalé par Dalili B. John (veille citoyenne par Initiative pour la Gouvernance de Proximité, CERC).
Other requests in Kavimvira Municipality
- Taken in charge10/11/2026 · Kavimvira Municipality Potholes on the RN30 and road works too slow Many potholes on the RN30. The company EIS AFRICA is too slow to finish building the road. Roads, bridges and streets — Kavimvira
- Being handled09/11/2026 · Kavimvira Municipality No drinking water in Kavimvira after pipes cut by heavy rains Rains cut REGIDESO pipes. Residents drink lake water, a health risk, as they cannot afford drinking water. Drinking water and sanitation — Kavimvira
- Taken in charge06/11/2026 · Kavimvira Municipality Too many petrol stations in Kavimvira Since the start of the year, more than 30 stations have been counted in a small area of only 10 km². Fuel and hydrocarbons (stations, depots, prices) — RN30