Roads, bridges and streets · Gouvernorat et Cabinet du Gouverneur
Espoir road critically damaged by erosion gullies in Kalimabenge
I note with great concern the advanced deterioration of Espoir road, in the Kalimabenge neighborhood. The numerous gullies caused by erosion make traffic very difficult, even impossible, for vehicles, motorbikes and bicycles. Once passable, this road is now in a deplorable state. Unfortunately, the local authorities remain silent in the face of this situation. We are making an urgent appeal to the competent authorities to intervene before this road is completely cut off.
Being handled Urgent
- Received16/11/2026
- Taken in charge17/11/2026
- ResolvedWaiting
- 11days since the request
- 4 hto be taken in charge
- —to be resolved
- —resident’s satisfaction
What the resident reported
I note with great concern the advanced deterioration of Espoir road, in the Kalimabenge neighborhood. The numerous gullies caused by erosion make traffic very difficult, even impossible, for vehicles, motorbikes and bicycles. Once passable, this road is now in a deplorable state. Unfortunately, the local authorities remain silent in the face of this situation. We are making an urgent appeal to the competent authorities to intervene before this road is completely cut off.
Translated by the GovCheck Assistant.
Original text
Je constate avec beaucoup d’inquiétude la dégradation avancée de la route Espoir, dans le quartier Kalimabenge. Les nombreuses têtes d’érosion rendent la circulation très difficile, voire impossible pour les véhicules, les motos et les vélos. Autrefois praticable, cette route est aujourd’hui dans un état déplorable. Malheureusement, les autorités locales restent silencieuses face à cette situation. Nous lançons un appel urgent aux autorités compétentes pour qu’elles interviennent avant que cette route ne soit complètement coupée.
News from residents
No news yet. Is the problem still there? Has something changed? Tell everyone.
What the City did
The City of Uvira received this report on 16/11/2026 and directed it to the Office des Routes. On 17/11/2026, it sent it to the Governorate and Office of the Governor and took it in charge. On 20/11/2026, under the provincial reconstruction tax, the South Kivu provincial government signed a contract with the company EIS-EKA to rehabilitate the urban roads of Uvira, including the Route Espoir.
Dated follow-up
-
20/11/2026 04:59 · Being handled
-
20/11/2026 04:56 · Taken in charge
Dans le cadre de la taxe provinciale sur la reconstruction, le gouvernement provincial du Sud-Kivu a signé un contrat avec la Société EIS-EKA pour la rehabilitation de la Voirie Urbaine dans la Ville d'Uvira y compris la Route Espoir.
-
17/11/2026 02:33 · Taken in charge
Report corrected by the administration.
-
17/11/2026 02:11 · Taken in charge
-
17/11/2026 02:10 · Received
Your request was passed on to: Gouvernorat et Cabinet du Gouverneur — Jean-Jacques Purusi Sadiki.
-
16/11/2026 21:56 · Received · GovCheck Assistant
Your report was identified and directed by GovCheck Agent to the Office des Routes for handling.
-
16/11/2026 21:56 · Received · GovCheck Assistant
No category chosen: the GovCheck Assistant is analysing the request to direct it to the right service.
-
16/11/2026 21:56 · Received
Request received.
What Office des Routes did
No public reply yet.
Other requests in City of Uvira
- Taken in charge14/11/2026 · City of Uvira Excessive deforestation on the hills overlooking Uvira Trees on Uvira's hills are not protected: almost all are bare, while the hills of Fizi territory are still covered with trees. Tree cutting, deforestation and bush fires — Quartier rungenge, quartier kavimvira même kalundu
- Taken in charge20/08/2026 · City of Uvira No drinking water in Kahwizi and Rutemba for years Residents of Kahwizi and Rutemba have had no access to drinking water for several years. Drinking water and sanitation — Kahwizi et Rutemba
- Received13/06/2026 · City of Uvira Stalls burned by police along the RN5 and overcrowded markets Police destroyed and burned stalls on the RN5 under construction. The Mulongwe and Maendeleo markets, flood-damaged, are saturated. Markets — Bords de la RN5 ; marchés Mulongwe, Maendeleo, Kalimabenge et Kavimvira
- Being handled01/06/2026 · City of Uvira Waste collection at risk as few households pay the fee The brigade says it cleared waste from 7,817 households, but only 1,800 paid the 3,000 FC fee. The city has over 38,000 households. Waste and cleanliness — Toute la ville ; berges du lac Tanganyika