Projects monitored
Investment projects from adopted budgets, visited by citizens with geotagged photos.
You know a project funded by your City or Municipality that is not listed? Report it: it will be checked, then you can follow how it is carried out and report problems if there are any.
100%
Results
Average progress
Physical progress of the projects started, as published by the City and checked during visits.
- Completed22%
- Visited on the ground0%
- projects monitored
- 9
- total investment
- —
- completed projects (value)
- —
- past their end date
- 1
- stalled or abandoned
- 0%
- field visits
- 0
- Cities and Municipalities
- 4
- sectors
- 5
6 projects
-
Construction du poste frontalier à guichet unique de Kavimvira (PFCIGL)
Frontière Kavimvira (RDC) – Gatumba (Burundi) —
Ongoing
-
Construction de la RN30 Uvira – frontière de Kavimvira
De la frontière de Kavimvira (Gatumba) au rond-point de Kavimvira (~6,7 km) — 28/02/2027
Ongoing
-
Réhabilitation du canal de captage d’eau de la REGIDESO sur la rivière Mulongwe
Captage de la Mulongwe (usine d’eau de la REGIDESO) — 18/05/2026
Ongoing
-
Asphaltage de la RN5, tronçon urbain Kavimvira – port de Kalundu (avec le pont Kavimvira)
Du rond-point de Kavimvira au port public de Kalundu (~10 km), pont Kavimvira —
Ongoing